Baltimore, MD, September 27, 2026 —

A significant infrastructure project aimed at enhancing the intersection of Maryland State Highway 543 and Maryland State Highway 136 in Harford County has commenced. The initiative carries an estimated cost of $4.8 million. Motorists in the area should anticipate ongoing traffic disruptions, including lane and shoulder closures, as the construction work is slated to continue through the spring of 2028.

The comprehensive scope of this project includes several key improvements designed to modernize the intersection and improve traffic flow and safety. The planned upgrades encompass widening the existing roadway to accommodate increased traffic volumes, resurfacing the pavement to ensure a smoother driving surface, and implementing modern traffic signal systems. Additionally, the project will address drainage improvements to enhance the area’s infrastructure resilience.

The start of construction marks the beginning of an extensive period of work, with completion anticipated in spring 2028. The duration of the project underscores the scale of the improvements planned for this critical Harford County intersection. Residents and commuters are advised to allow for additional travel time and exercise caution when navigating through the work zones.

Specific details regarding the exact phases of construction, daily work hours, or alternative routes are not provided in the summary. The contractor’s name for this $4.8 million project was also not specified. The Maryland Department of Transportation (MDOT) is overseeing the project, which aims to deliver substantial upgrades to a vital local transportation nexus.


Story summarized from the original created by Siobhan Garrett on www.wmar2news.com, see more information here.

About The Author